Lake Whitney Road Closures

Partial road closures in Lake Whitney Lane next week to complete some crack repairs. Below is the schedule.  The work is planned to be completed by Wednesday to ensure that trash collection services are not affected by the road closures. 

SCHEDULE:

  • Monday, 9/22/25 – PH 1 A ROAD CLOSURE. There are 9 repairs to be made in this section.
    • A 4-ft panel section will be removed and replaced in this area.  After pouring concrete, a barricade will be installed to protect the concrete until the required strength is achieved, and the road will be reopened. 
    • The Traffic Control Plan (TCP) will be removed by End of Day (EOD).
  • Tuesday, 9/23/25 – Ph 1 B ROAD CLOSURE. There are 8 crack repairs to be made in this section.
    • The lane will be reopened by the end of the day.
    •  TCP will be removed by EOD.
  • Wednesday, 9/24/25 – Ph 2 A ROAD CLOSURE. There are 9 repairs to be made in this section.
    • A 4-ft panel section will be removed and replaced in this area.  After pouring concrete, a barricade will be installed to protect the concrete until the required strength is achieved, and the road will be reopened. 
    • TCP will be removed by EOD.