{"id":561,"date":"2025-09-19T09:16:46","date_gmt":"2025-09-19T14:16:46","guid":{"rendered":"https:\/\/northbethanylakeestates.com\/?p=561"},"modified":"2025-10-20T14:55:04","modified_gmt":"2025-10-20T19:55:04","slug":"lake-whitney-road-closures","status":"publish","type":"post","link":"https:\/\/northbethanylakeestates.com\/?p=561","title":{"rendered":"Lake Whitney Road Closures"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote\">\n<p>Partial road closures in Lake Whitney Lane next week to complete some crack repairs. Below is the schedule.&nbsp; The work is planned to be completed by Wednesday to ensure that trash collection services are not affected by the road closures.&nbsp;<\/p>\n<\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>SCHEDULE:<\/p>\n\n\n\n<ul>\n<li>Monday, 9\/22\/25 \u2013 PH 1 A ROAD CLOSURE. There are 9 repairs to be made in this section.\n<ul>\n<li>A 4-ft panel section will be removed and replaced in this area.&nbsp; After pouring concrete, a barricade will be installed to protect the concrete until the required strength is achieved, and the road will be reopened.&nbsp;<\/li>\n\n\n\n<li>The Traffic Control Plan (TCP) will be removed by End of Day (EOD).<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul>\n<li>Tuesday, 9\/23\/25 \u2013 Ph 1 B ROAD CLOSURE. There are 8 crack repairs to be made in this section.\n<ul>\n<li>The lane will be reopened by the end of the day.<\/li>\n\n\n\n<li>&nbsp;TCP will be removed by EOD.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<ul>\n<li>Wednesday, 9\/24\/25 \u2013 Ph 2 A ROAD CLOSURE. There are 9 repairs to be made in this section.\n<ul>\n<li>A 4-ft panel section will be removed and replaced in this area.&nbsp; After pouring concrete, a barricade will be installed to protect the concrete until the required strength is achieved, and the road will be reopened.&nbsp;<\/li>\n\n\n\n<li>TCP will be removed by EOD.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Partial road closures in Lake Whitney Lane next week to complete some crack repairs. Below is the schedule.&nbsp; The work is planned to be completed by Wednesday to ensure that trash collection services are not affected by the road closures.&nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/posts\/561"}],"collection":[{"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=561"}],"version-history":[{"count":1,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/posts\/561\/revisions"}],"predecessor-version":[{"id":562,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=\/wp\/v2\/posts\/561\/revisions\/562"}],"wp:attachment":[{"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northbethanylakeestates.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}